6月16日,随着长荣“长德轮”顺利挂靠,标志着盐田港西港区4-6号泊位的升级扩容已完成,正式投入使用今年6月初,盐田港西港区4-6号泊位升级扩容项目通过验收,自此,该作业区即可操作7万吨级大型集装箱船舶
这三个泊位也配备了岸基船舶供电系统,可为靠岸船舶提供岸电服务长荣“长德轮”船长300米,宽40.8米,吃水达13.5米,总吨位达7.6万吨,此次共装卸约3160个标箱
These three berths are also equipped with shore based ship power supply system, which can provide shore power services for ships berthing. EVA "Changde" has a length of 300 meters, a width of 40.8 meters, a draft of 13.5 meters, and a total tonnage of 76000 tons. A total of 3160 TEUs were loaded and unloaded this time
转载于:http://www.ytport.com/xwzx/jtxw/201906/t20190619_6682.html 如涉及侵权,请直接联系我们删除,谢谢!